This is a small section of the pipeline route at Baldpate Mountain. The  pinkish color here is the 400' study corridor. The orange color represents the proposed pipeline route. The light blue section is the 150'-200' workspace, that will have to cleared and level. Power lines Right Of Way (ROW) is located above the light blue and the edge of the 400 foot study corridor. So this does not drastically minimize the need for tree cutting as PennEast states.  Vist PipeInfo.org for more maps and information.